PMO Assist · Docs

Feature 3 of 8 · Projects

Projects & Delivery

Everything a delivery team needs to plan and run work, as its daily tool: backlogs, sprints, boards, releases, milestones and intake, on one shared structure so figures mean the same thing in every project.

7Standard work types
4 stepsProject set-up
BaselineOn every milestone
ImportFrom Azure DevOps

What teams can do

Set up

A project in one guided wizard

Details, Delivery (account, programme, delivery model, workstreams, dates), an optional Azure DevOps import, and Review. Nothing is created until Review is confirmed, so nothing is left half-made.

Staff

A team with hours and a cost

Add people with a project role, an access level, hours a week, dates and a cost per hour. The Team page shows how booked each person is everywhere, and what the team costs.

Plan

Backlog, sprints and scope

Drag work into sprints, take a suggested sprint scope, and run a plan check that flags unestimated, oversized or blocked items before the sprint starts.

Run

Board, standup and insights

A Kanban board with WIP limits, a person-by-person standup, and sprint insights that name the decisions needing attention.

Ship

Releases that fill themselves

Every open work item sits in its workstream's next planned release. Marking a release released moves unfinished work on to the next one.

Commit

Milestones with baselines

The committed date moves only by a deliberate, recorded re-baseline. Forecasts and slippage are measured against it, and feed schedule health.

Intake

Requests from outside the team

Publish a form anyone with the link can fill in. Every report waits in a triage queue until a lead accepts it into a work item, marks it a duplicate, declines it or marks it spam. The reporter follows progress on a tracking page.

Import

Bring Azure DevOps work across

Hierarchy, area paths, iterations, states, assignees, estimates, tags and dates. Re-importing updates rather than duplicates.

One structure for every project

TierTypeEstimated in
0EpicDates (from what sits under it)
1FeatureDates (from what sits under it)
2Story · ImprovementStory points
2BugHours
3–4Task · SubtaskHours

Because tiers are fixed, hours logged on a task under a bug count as defect effort everywhere. A project can add its own types, but its settings warn when it drifts, because its figures would stop lining up with other projects.

Workstreams: chosen once

When a project is created, its Workstreams are set to The project (one workstream) or Each epic. In an each-epic project, every release and milestone belongs to one epic, and the weekly status reports each epic as its own section. It can't change later, because releases and milestones are filed by it.

Inside a project

SectionFor
OverviewHealth with the reason for each dimension, what needs attention, what lands next, recent changes, each workstream.
Board · Backlog · SprintsThe daily work: the board, all unfinished work as a tree, and each sprint's plan, standup and insights.
Work itemsEvery work item with the full filter set. Filtered views are shareable links.
IntakeForms, their links and the triage queue.
Milestones · Releases · AreasThe plan: committed dates, what ships when, and which part of the product work belongs to.
ReportsThe weekly status and delivery reports.
TeamMembers, access, allocations, hours, cost and staffing advice.
SettingsWorkflow and board, hierarchy, fields, screens, labels, policies, integrations.

Built for speed

Why it matters for leadership

Step by step: Projects and the team, Backlog, sprints and board and Milestones and releases in the User guide.