PMO Assist · Docs

User guide · Time

Timesheets

Timesheets is where you log your week across every project at once. It is the same record as Log work on a work item. It appears for everyone with a resource profile.

Logging your week

  1. Open Timesheets. The week runs Monday to Sunday, one row per work item, with day totals along the bottom and the week total at the end. Previous and next move a week.
  2. Add an item if its row isn't there. The picker switches between items assigned to you and any item in your projects; search by title or by number (#101188).
  3. Click a cell to see that day's entries for the item, and add one: either a start and end time or a number of minutes, a note of up to 500 characters, and a billable switch that starts on the project's default.
  4. Save. Each cell shows the day's time as 2h 30m, with a count when there are several entries.

The rules

They show before you save, and the server enforces the same ones.

RuleWhat you see
A day above 8 hoursThe day tints as a warning. You can still save.
A day above 12 hours across all projectsThe save is blocked. One entry is also at most 12 hours.
Overlapping start and end times on one day, across projectsRefused.
A future dateRefused.
A range that runs past midnightRefused; log the rest on the next day.
A locked monthMonths before the previous one are read only, with the reason shown, unless you can edit everyone's time on that project.

The Team tab

LeadOwner The Team tab appears for anyone who can see everyone's time on at least one project.

  1. Pick a project to see every active member's totals for the week.
  2. Open a member's week in the same grid, and edit, delete or log on their behalf, locked months included.

How logs change a work item

Where logged time shows up